Asphalt Rejuvenating starting Tuesday, October 21st
As part of the City of Jasper’s on-going infrastructure maintenance, the Jasper Street Dept, along with contractor, RejuvTec, will be applying a Reclamite preservation solution to the following streets, beginning Tuesday, October 21st .
Beginning each day at approximately 7:30 a.m. thru approximately 5:00 p.m. each day. The possibility exists of extending into the following week, in the event of inclement weather conditions or other unforeseen events. Reclamite is an asphalt rejuvenating emulsion that restores the original binder back to a proper balance.
All vehicles must be removed prior to 7:30 a.m. from streets being processed.
Affected residents will be notified, via a door hanger, in advance of treatment on their street. Motorists will not be allowed on these streets prior to contractor removing the barricades. Once barricades have been removed, the surface will be very slick with sand & may result in solution adhering to vehicles, therefore, extreme caution is advised, should you travel these streets shortly after barricades are removed.
Sand will be removed within 2 days. Trash, Recycling & Yard waste collection will proceed as normal & MUST be out no later than 7:00 a.m. for pickup, as our heavy trucks will not be traveling on fresh application. Please do not place leaves or yard waste in the street.
Affected streets are as follows: (may not be processed in this order)
2025 REJUVENATING |
|
PROJECT LIST |
|
|
|
Street Name |
From…to(West to East; South to North) |
|
|
MacArthur St. |
9th-13th Street |
|
|
W 15th St. |
St. Charles St.-Rolling Ridge Road |
|
Intersection at 15th & Rolling Ridge |
|
|
MacArthur St. |
7th-8th Street |
|
|
3rd Avenue |
Merdian Rd-City Limits |
|
|
3rd Avenue |
Justin St-Meridian Rd. |
|
|
Reyling Drive |
Leslie Dr.-to just west of Manor Dr. |
|
|
West 33rd St. |
Newton St. – West Dead End |
|
|
Plymouth St. |
ALL |
|
|
Dodge St. |
Giesler Rd-Dead End |
|
|
Common Drive |
From Home Depot to North End |