Utility Emergency: 812-482-9131
Local Time

Document Center

Pavement Preservation UPDATED

UPDATED: Sept. 23, 2020

Due to circumstances beyond our control, with the contractor, this Project is scheduled to begin tomorrow, Thurs. Sept. 24 instead of the previously stated date of Wed. Sept. 23.

The Jasper Street Dept sincerely apologizes for any inconvenience which this may cause. 

The following Streets are scheduled to the first area being done on Thurs. Sept 24th:

      Robert St         13th to 14th                             

      Dorbett St       13th to 14th                             

      Howard Dr      Northwood to 33rd                                         

      Scott Rolen Dr 5th St to south end                                         

      St. John St       4th St to 6th St 

 

With the following streets to be done on Friday, Sept 25th:

      Wilson St         13th to 14th                             

      5th St              Clay to US 231            

 

Again, we sincerely apologize for the delay.

 

The following Restrictions apply:

All vehicles must be removed from the affected streets & out of driveways, should residents intend to leave throughout the day of Preservation to their street, as these streets will be Closed during this process, & motorists will not be allowed to travel on them.

The street being processed, should however, re-open each evening, depending on drying conditions. 

All residents will be notified via a door hanger, the day prior to their street being processed.

 

**NOTE:  There will be a lot of switching from street to street as drying conditions & traffic flow will be continually assessed.**

 

Thank you

------------------------------------------------------------------------------------------------------------------

The Jasper Street Dept, along with contractor, Pavement Solutions, will begin a pavement preservation project on Wednesday, Sept. 23rd at approximately 8:00 a.m.  

All vehicles must be removed from the affected streets & out of driveways, should residents intend to leave throughout the day of Preservation to their street, as these streets will be Closed during this process, & motorists will not be allowed to travel on them.

The street being processed, should however, re-open each evening, depending on drying conditions. 

All residents will be notified via a door hanger, the day prior to their street being processed.

 

**NOTE:  There will be a lot of switching from street to street as drying conditions & traffic flow will be continually assessed.**

 

Project Streets to be affected are as follows:

Robert St – 13th St to 14th St

Wilson St – 13th St to 14th St

Dorbett St – 13th St to 14th St

5th St – Clay St to St John St

5th St – St John to Scott Rolen Dr

5th St – Scott Rolen Dr to Hwy 231

Scott Rolen Dr – 5th St to South End

St John St – 4th St to 6th St

Howard Dr – Northwood Ave to 33rd St

 

This project should be completed by the end of the day on Friday, Sept. 25, barring inclement weather or any other unforeseen events.

Thank you